top of page

Final Report

The final report is an account of all work and analysis conducted throughout this thesis period of the 2015-2016 school year. Contained within the report is a lighting depth, electrical depth, structural breadth, and acoustical breadth. The lighting depth involves a complete redesign of four spaces within the BAM Fisher Building from the conceptual phase through construction administration and documentation.  The electrical depth invovevs the investigation of several studies to improve the electrical system through cost, efficiency, or sustainability. The structural breath proposes a change in building envelope with thermal and structural analysis. Finally, the acoustical breadth analyses the effect of the integrated lighting and acoustic tiles in the dance studio.

Complete Report

Report without Appendices

Executive Summary

Appendices

Download from Google Drive

This page was last updated on 4/26/2016 by Megan Grant and is hosted by the AE Department ©2015

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in‐ progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Megan Grant. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

bottom of page